Compliance of pressure equipment

Manage the compliance of pressure equipment without giving up peace of mind
On a nuclear site, the ESP (tanks, tanks, compressors, tanks, fluid circuits...) and their equivalents Nuclear classified (ESP-N) are subject to a strict regulations, of periodic inspection obligations, and a seamless documentary traceability.
But in practice, managing them is often a nightmare:
- scattered files,
- incomplete control histories,
- confusion about responsibilities,
- failure to requalify,
- lack of an overview of the park...
The most frequent field problems
- Incomplete or outdated inventory ESP/ESP-N present on site
- History of checks and requalifications missing or inaccessible
- Lack of connection between physical equipment and its technical documentation
- Difficulty knowing what is compliant/in an anomaly/waiting for requalification
- Equipment moved or modified without updating data
- Waste of time in auditing to gather evidence of compliance
What BROLZ allows
BROLZ structures the management of ESP and ESP-N as a genuine technical and regulatory monitoring system, adapted to nuclear requirements.
Key features:
- Full ESP/ESP-N inventory, with unique identification
- Direct link to technical documentation : Compliance report, Manufacturer files, requalifications, plans...
- Digitized life sheet by equipment, accessible in the field via QR code
- Expiry requalification/check alerts
- Clear visualization of statuses : compliant, subject to, non-compliant
- Traceability of movements/locations/assignments
- Possibility of attach photos, intervention reports or discrepancy notes
What does that actually change
- No more forgotten equipment : everything is traced, even what is not in front of you
- Less inspection stress : everything is documented, up to date, accessible
- Global vision of the park, by site, building, or zone
- Clarified responsibilities : who manages what, who should do what, when
- Real time savings for safety engineers, maintenance engineers and compliance managers
Resource in preparation
We are working on a practical guide to managing ESPs/ESP-Ns:
- inventory structure to be adopted,
- key control points,
- examples of life records,
- documentary organization.
Subscribe to the newsletter to be notified when it is published.
ESP & ESP-N: not only a regulatory constraint, a lever to effectively structure your maintenance practices
With BROLZ, compliance becomes a smooth process, not a dead weight.