Waste Drum

Every Drum Must “Speak” — Anytime, For Years

In the nuclear sector, conditioning low-level waste in drums is routine.
What’s not routine? Ensuring reliable, long-term traceability.

What really goes inside the drum, how it was filled, what measurements were taken, which inspections were performed, and how regulatory compliance is proven — these are critical topics, especially for:

  • regulatory audits,
  • transfers to approved disposal routes,
  • safety reviews during operations or decommissioning.

Common field issues

  • Poor traceability on waste origin: from which project? from which activity?
  • Scattered data: spectrometry, filling sheets, photos… never stored in one place
  • Confusion between batches: adding waste to an open drum without formal updates
  • No immediate evidence during inspections: missing net mass, type, or clear composition
  • Difficulty reconstructing a complete drum dossier, even for recent containers

How BROLZ helps

BROLZ ensures complete, clear, and long-term traceability at the level of each individual drum — while remaining simple for field teams.

Key features:

  • Unique record per drum: ID, type, volume, status, package code, content, closure date
  • Capture of origin data: project, zone, contractor, waste type
  • Step-by-step content entries with digital signature, photos, measurements, spectrometry if needed
  • Tracking of regulatory checks: weighing, surface measurements, contamination, declared activity
  • Linked documents: closure reports, RP reports, spectrometry files
  • Full lifecycle history: creation, additions, reconditioning, storage, transfers
  • Visualisation on storage maps with status and destination (on-site storage, pending, dispatch)

What changes with BROLZ

  • Every drum becomes a traceable, fully documented nuclear package
  • Immediate answers during audits — no chasing missing paperwork
  • Reliable conditioning, reduced errors and batch mix-ups
  • Streamlined shipment campaigns with a clean, filterable inventory
  • Rigorous preparation for decommissioning or clearance operations

Get new use cases by email

We’ll send you a confirmation email. Unsubscribe in one click. Privacy policy

Almost there! Confirm your subscription using the email we just sent you.
Error, please try again.